Update On The Infrastructure Problem

Posted: February 4, 2012 in Uncategorized
Tags: ,

I posted this earlier, and called it Infrastructure Problem?

I am happy to report that this bridge is currently being repaired. Right now, there is temporary light-controlled traffic over the bridge, and the heavy equipment is on-site. There is also a rather large rebar cage on the side of the road.

We are happy that the bridge will be fixed. I am not an engineer or a transportation/roadway expert, but it kinda looked unsafe in its state of disrepair.

Plus, it is nice to see that some folks still have steady employment in this declining economy.

Bridge over creek

I may have mentioned that I enjoy creek walking. This is a bridge over a creek that we often visit to take treats to the fish.

Here is the close-up of the large crack in the cement, that runs from the top of the bridge to the bottom:

Bridge close-up

We would not want to go all crazy in this country and create any jobs to repair our infrastructure though, would we?

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s